When installing refrigerant piping for an A2L system that penetrates two or more floors in a multi-story building, which of the following is a primary requirement according to the International Mechanical Code (IMC) and ASHRAE 15?
-
A
The piping must be painted red and labeled every 10 feet.
-
B
The piping must be enclosed in a fire-resistance-rated shaft.
-
C
The piping diameter must be increased by 25% for vertical runs.
-
D
The piping must be supported by hangers every 2 feet.