A maintenance planner is building a job plan for a complex repair on a critical asset. To ensure the work can be executed efficiently and safely by the technician, which of the following is the MOST crucial element to include in the plan?
-
A
A detailed cost estimate of all required parts and labor.
-
B
A list of similar repairs completed in the past for reference.
-
C
Step-by-step instructions with specific safety procedures and required tools.
-
D
The production schedule for the week the repair is scheduled.