A work center's planned input is 100 standard hours, and the planned output is 100 standard hours. Over the past week, the actual input was 90 hours, and the actual output was 80 hours. What is the immediate conclusion a production planner should draw using input/output control?
-
A
The work center is a bottleneck because its output is less than its input.
-
B
The work center's capacity should be permanently increased.
-
C
The work center performed with 80% efficiency.
-
D
A backlog of 10 standard hours has been created this week.