An inspector observes a stockpile of soil on a construction site that will be inactive for the next 21 days. Which of the following erosion control BMPs is MOST appropriate to prevent wind and water erosion from the stockpile?
-
A
Installing a silt fence around the base of the stockpile.
-
B
Applying a soil tackifier or covering with a tarp.
-
C
Creating a diversion dike upslope of the stockpile.
-
D
Compacting the surface of the stockpile with heavy machinery.