An inspector observes minor sediment tracking from the construction exit onto a public road. While the inspector is on-site, the contractor immediately dispatches a sweeper to clean the road. How should the inspector document this in the inspection report?
-
A
Note the deficiency and the immediate corrective action taken in the same report.
-
B
Do not record the deficiency, as it was corrected on the spot.
-
C
Only document the deficiency and create a separate corrective action report for the contractor to sign.
-
D
Inform the site superintendent verbally but omit it from the formal written report to save time.