A manufacturing facility has a pipe that discharges treated wastewater directly into a river. Under the Clean Water Act (CWA), what is this type of discharge conveyance called and what is required before this discharge is legally permissible?
-
A
Nonpoint source; a Best Management Practice (BMP) plan
-
B
Point source; a National Pollutant Discharge Elimination System (NPDES) permit
-
C
Indirect discharge; approval from the local Publicly Owned Treatment Works (POTW)
-
D
Sheet flow; a Total Maximum Daily Load (TMDL) allocation