What is the primary objective of value engineering (VE) in construction?
-
A
To reduce project scope
-
B
To achieve required functions at the lowest life-cycle cost without sacrificing quality or performance
-
C
To eliminate all contingency allowances
-
D
To accelerate the construction schedule