What is the primary authorization granted to the holder of a Production Certificate (PC) under 14 CFR Part 21?
-
A
To approve new type designs for aircraft and engines.
-
B
To obtain a U.S. airworthiness certificate for products manufactured in conformity with the type design, without further showing.
-
C
To issue Supplemental Type Certificates (STCs) for modifications to any aircraft.
-
D
To perform major repairs and alterations on products they manufacture.