NETTCP Field Testing 3 — Questions and Answers
Question 1: A field technician performing a Clegg Impact Soil Tester (CIST) test obtains a Clegg Impact Value (CIV) well below the specification minimum. What does this likely indicate?
- The soil is over-compacted
- The soil stiffness is insufficient and additional compaction is needed (Correct answer)
- The moisture content is too low
- The test equipment needs recalibration
Correct answer: The soil stiffness is insufficient and additional compaction is needed
A low CIV indicates the soil lacks the required stiffness, typically meaning more compaction passes are needed before it meets specification.
Question 2: When sampling hot mix asphalt (HMA) from a truck for field quality control, samples should be taken from:
- The top center of the truckload
- Multiple locations across the truck bed, avoiding edges and top surface (Correct answer)
- Only the bottom of the load closest to the tailgate
- The freshly unloaded windrow on the paving mat
Correct answer: Multiple locations across the truck bed, avoiding edges and top surface
Sampling from multiple interior locations avoids the segregated, cooled surface material and provides a representative sample.
Question 3: During a field inspection, a technician notices transverse cracking at regular intervals on a newly placed asphalt overlay. The most likely cause is:
- Insufficient tack coat application
- Reflection cracking from underlying pavement joints (Correct answer)
- Over-compaction by the vibratory roller
- Contaminated aggregate in the mix
Correct answer: Reflection cracking from underlying pavement joints
Regularly spaced transverse cracks in an overlay typically reflect the joint pattern or pre-existing cracks from the underlying pavement layer.
Question 4: What is the primary purpose of applying a tack coat before placing an asphalt overlay?
- To waterproof the existing pavement surface
- To provide bond between the existing surface and the new overlay (Correct answer)
- To fill surface distresses before paving
- To cool the pavement before roller compaction
Correct answer: To provide bond between the existing surface and the new overlay
Tack coat (emulsified asphalt) creates adhesion between the existing pavement and the new HMA layer to prevent layer slippage.
Question 5: A technician is performing a field ride quality evaluation using an inertial profiler. What parameter does this device primarily measure?
- Pavement surface friction
- International Roughness Index (IRI) (Correct answer)
- Pavement cross-slope and superelevation
- Lane marking retroreflectivity
Correct answer: International Roughness Index (IRI)
An inertial profiler measures longitudinal pavement elevation profiles, which are processed to calculate the International Roughness Index (IRI).
Question 6: According to AASHTO standards, how many concrete cylinders should typically be cast per composite sample for compressive strength testing on a highway project?
- 1 cylinder per sample
- 2 cylinders per sample at minimum (Correct answer)
- 4 cylinders per sample
- 6 cylinders per sample
Correct answer: 2 cylinders per sample at minimum
AASHTO requires a minimum of two cylinders per composite sample so one can be tested at 28 days and one held for verification or early testing.
Question 7: When measuring pavement layer thickness in the field using a core sample, where should thickness be measured?
- At the widest visible point of the core
- Perpendicular to the top and bottom surfaces at multiple locations averaged (Correct answer)
- Only at the center of the core
- Along the longest diagonal of the core cross-section
Correct answer: Perpendicular to the top and bottom surfaces at multiple locations averaged
Thickness is measured perpendicular to the layer surfaces at several points around the core circumference and averaged for accuracy.
A field technician performing a Clegg Impact Soil Tester (CIST) test obtains a Clegg Impact Value (CIV) well below the specification minimum.
What does this likely indicate?