  1. The polarization index (PI) is calculated by dividing the insulation resistance measured at 10 minutes by the reading at:

    Answer: 1 minute

    PI = IR at 10 minutes divided by IR at 1 minute; a value of 2.0 or above generally indicates acceptable insulation condition.

  2. Which safety precaution is mandatory before connecting a megohmmeter to a large capacitive load such as a cable run?

    Answer: Verify the load is de-energized and fully discharged

    Capacitive equipment stores dangerous charge; the equipment must be de-energized and discharged (verified with a voltmeter) before connecting the megohmmeter.

  3. In a transformer turns ratio (TTR) test, a ratio error exceeding what percentage typically triggers further investigation per NETA MTS?

    Answer: 0.5%

    NETA MTS flags a turns ratio deviation greater than 0.5% from the nameplate ratio as requiring further evaluation for possible winding faults.

  4. When performing an AC high-potential (hipot) test on cable insulation, the test voltage is typically applied for:

    Answer: 1 minute

    The standard AC hipot withstand duration for cable insulation per NETA MTS is 1 minute at the specified test voltage.

  5. A very low frequency (VLF) test on medium-voltage cable uses a test frequency of:

    Answer: 0.1 Hz

    VLF testing uses 0.1 Hz (or 0.01–0.1 Hz range) to stress cable insulation at a fraction of the normal power frequency, reducing the required kVA from the test set.

  6. During a sweep frequency response analysis (SFRA) test on a power transformer, the primary purpose is to detect:

    Answer: Winding deformation or displacement due to mechanical stress

    SFRA compares frequency response signatures to detect physical winding movement, deformation, or damage caused by through-faults or transportation.

  7. What test is performed to verify that a protective relay correctly operates at the designed current pickup level?

    Answer: Secondary current injection test

    Secondary injection testing applies a calibrated current directly to the relay's current input terminals to verify pickup, timing, and trip function without energizing primary equipment.