Which NERC standard requires Balancing Authorities and Transmission Operators to have emergency operations plans?
Answer: EOP-001
EOP-001 requires Balancing Authorities and Transmission Operators to have plans for managing operations during emergencies, including personnel and communication protocols.
NERC EOP-005 governs which critical grid restoration capability?
Answer: System restoration plans including black start capability
EOP-005 requires transmission operators and balancing authorities to have system restoration plans and verify black start resource capability.
What is a 'Black Start' resource in the context of NERC EOP-005?
Answer: A generating unit capable of starting without an external power source to help restore the grid
A black start resource can energize transmission lines and pick up load without requiring external power, enabling grid restoration after a blackout.
Under NERC EOP-006, what coordination is required during a wide-area disturbance?
Answer: Reliability Coordinators must coordinate with each other during system restoration
EOP-006 requires Reliability Coordinators to have procedures for coordinating system restoration across their areas and with neighboring RCs.
NERC's 'Under-Frequency Load Shedding' (UFLS) program is designed to:
Answer: Automatically disconnect controlled amounts of load when system frequency drops dangerously low
UFLS automatically sheds load in controlled blocks when frequency drops below set thresholds, preventing a total system collapse.
Which NERC standard addresses under-voltage load shedding (UVLS) requirements?
Answer: PRC-010
PRC-010 requires transmission planners and planning coordinators to ensure UVLS schemes are coordinated and effective in preventing voltage collapse.