A soiling loss study on a utility-scale PV plant shows a 3% monthly energy loss. The O&M team wants to determine the optimal cleaning frequency. This decision should primarily be based on:
-
A
The inverter manufacturer's warranty requirements
-
B
A cost-benefit analysis comparing cleaning costs against the value of recovered energy
-
C
The local fire department's water use restrictions
-
D
The maximum tilt angle of the array