What is the correct procedure for locking out a grid-tied PV system before performing maintenance on the inverter?
-
A
Turn off the inverter's power switch only
-
B
Open the AC disconnect, apply lockout/tagout, then open the DC disconnect and apply lockout/tagout
-
C
Remove fuses from the combiner box only
-
D
Disconnect the battery bank if present