An inspector observes that the PV system's rapid shutdown (RSD) initiator is located inside the building at the main service panel, but there is no RSD label at the roof access point. What NABCEP/NEC concern does this raise?
-
A
The initiator must be located outdoors near the array
-
B
First responders must be able to identify and operate RSD from outside the building
-
C
The RSD system must be wireless to comply with NEC 690.12
-
D
The initiator must be at the utility meter location