What is the correct sequence for de-energizing a grid-tied PV system during a commissioning fault investigation?
-
A
Open DC disconnect, then AC disconnect, then utility disconnect
-
B
Open AC disconnect first, then DC disconnects from array
-
C
Open utility disconnect first, then AC, then DC from array
-
D
Open all disconnects simultaneously