← All NABCEP Flashcard Decks

System Maintenance Flashcards

7 cards from real NABCEP practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 System Maintenance flashcards as text
  1. During a visual inspection of a PV array, you notice that several module junction boxes have covers that are cracked or missing. What is the priority concern?

    Answer: Exposure of live DC conductors and bypass diodes to moisture and environmental contamination

    Open or damaged junction boxes expose energized DC terminals and bypass diodes to moisture, insects, and debris, creating shock hazards and potential for arcing or corrosion-related failures.

  2. A flooded lead-acid battery bank requires regular watering. When should distilled water be added relative to the charging cycle?

    Answer: Immediately after a full charge when gassing has subsided and electrolyte levels can be accurately assessed

    Watering after a full charge prevents overfilling since electrolyte expands during charging, and it allows accurate measurement of the settled electrolyte level once gassing has stopped.

  3. What is the most effective method for detecting a high-resistance connection in a PV array string without disconnecting the system?

    Answer: Using an infrared camera to identify hot spots at connectors and terminals under operating conditions

    A high-resistance connection dissipates power as heat, which is detectable with an infrared camera while the system is operating at load, without requiring disconnection.

  4. A grid-tied inverter is repeatedly disconnecting from the grid and reconnecting every few minutes. Which of the following is the MOST likely cause?

    Answer: Grid voltage or frequency excursions outside the inverter's permissible operating window

    Grid-interactive inverters are required by standards such as IEEE 1547 to disconnect when utility voltage or frequency moves outside defined limits, then reconnect after a mandatory reconnection delay.

  5. When checking specific gravity of flooded lead-acid battery cells with a hydrometer, what does a reading of 1.265 at 77°F (25°C) generally indicate?

    Answer: The battery cell is in good condition and at or near full charge

    A specific gravity of approximately 1.265 at 25°C is the typical fully-charged value for standard flooded lead-acid batteries, indicating healthy, fully-charged electrolyte.

  6. A technician is reviewing a string inverter's event log and finds repeated 'insulation fault' or 'Riso low' error codes. What does this indicate?

    Answer: There is a low-resistance path between the DC conductors and ground, indicating a ground fault or degraded insulation

    Riso (insulation resistance) monitoring measures the resistance between DC circuit conductors and ground; a low Riso value indicates moisture ingress, damaged wiring insulation, or a ground fault that requires immediate investigation.

  7. During a maintenance visit, the technician finds that module mounting clips on a ballasted flat-roof system have shifted and some modules are no longer secure. What is the immediate safety and maintenance priority?

    Answer: Secure the modules to prevent wind uplift and damage, then assess cause of movement and verify compliance with wind load design

    Unsecured modules on a rooftop are an immediate wind uplift hazard that could cause modules to become airborne; securing them and then investigating the root cause and design compliance is the correct priority sequence.

System Maintenance Flashcards — NABCEP Study Cards with Answers