Research and Program Evaluation Flashcards
7 cards from real MSW practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 7 Research and Program Evaluation flashcards as text
A researcher conducting a needs assessment wants to identify gaps between current services and community needs. Which data collection method provides the broadest community perspective most efficiently?
Answer: Community survey
A community survey reaches a large representative sample and efficiently quantifies the scope of unmet needs across a population.
Which type of validity assesses whether a measure correlates with a theoretically related variable?
Answer: Construct validity
Construct validity evaluates whether a measure behaves as theory predicts in relation to other variables.
In a longitudinal study tracking child welfare outcomes over five years, participants who move away and cannot be re-interviewed represent which threat?
Answer: Attrition (mortality)
Attrition occurs when participants drop out over time, potentially biasing results if dropouts differ systematically from those who remain.
A social worker reviews aggregate data showing that neighborhoods with more liquor stores have higher crime rates. Concluding that alcohol causes individual criminal behavior is an example of:
Answer: Ecological fallacy
The ecological fallacy occurs when conclusions about individuals are incorrectly drawn from group-level aggregate data.
Which IRB category typically applies to anonymous surveys about non-sensitive topics with minimal risk?
Answer: Exempt review
Anonymous surveys on non-sensitive topics generally qualify for exempt status under federal research regulations because they pose minimal risk.
A researcher codes qualitative interview data and then has a second researcher independently code the same data to assess:
Answer: Inter-rater reliability
Inter-rater reliability (also called inter-coder reliability) measures agreement between independent coders applying the same coding scheme.
Logic models in program evaluation are primarily used to:
Answer: Map the relationship between program inputs, activities, outputs, and outcomes
A logic model visually depicts the program theory by linking resources and activities to intended short- and long-term outcomes.