Movement Belay Certification Movement Belay Communication and Commands 2 — Questions and Answers
Question 1: What does 'Up rope' direct the belayer to do?
- Feed out rope
- Take in excess slack (Correct answer)
- Lock off the belay device
- Prepare for a fall
Correct answer: Take in excess slack
'Up rope' tells the belayer to take in rope to eliminate excessive slack hanging below the climber.
Question 2: When a climber anticipates a difficult move and wants the belayer to be especially attentive, which phrase should they use?
- Take!
- Belay on
- Watch me (Correct answer)
- Falling
Correct answer: Watch me
'Watch me' alerts the belayer to pay close attention as the climber may fall, prompting readiness to arrest a fall.
Question 3: What is the primary reason climbing commands are kept short and distinct?
- Tradition from early mountaineering
- To reduce confusion and ensure clarity over distance and noise (Correct answer)
- Because climbers' hands are busy
- To save energy while climbing
Correct answer: To reduce confusion and ensure clarity over distance and noise
Short, distinct commands minimize misunderstanding in noisy or windy environments where words can be distorted or cut short.
Question 4: If a climber calls out 'Falling!' what should the belayer do immediately?
- Feed slack to absorb the fall
- Move toward the wall
- Lock off the belay device into brake position (Correct answer)
- Shout 'Rock!'
Correct answer: Lock off the belay device into brake position
On hearing 'Falling!', the belayer must instantly lock off the belay device to arrest the fall and hold the climber's weight.
Question 5: Before the check-in sequence begins, both the climber and belayer should visually inspect which items?
- Harness buckles, belay device setup, and knot (Correct answer)
- Helmet, chalk bag, and shoes
- Route grade, hold size, and anchor type
- Rope diameter, carabiner gate, and wall height
Correct answer: Harness buckles, belay device setup, and knot
The pre-climb check includes verifying harness buckles are doubled back, the belay device is rigged correctly, and the tie-in knot is dressed and clipped.
Question 6: In a gym setting, what is the correct sequence of communication before a climber begins?
- Climbing → Belay on → Climb on
- Belay on → Climbing → Climb on (Correct answer)
- Climb on → Belay on → Climbing
- On belay → Belay on → Climb on
Correct answer: Belay on → Climbing → Climb on
The belayer first confirms the system is ready with 'Belay on,' the climber then announces intent with 'Climbing,' and the belayer confirms with 'Climb on.'
Question 7: What command should a belayer use to confirm they have the climber on belay and are ready?
- Ready
- Climb on
- Belay on
- On belay (Correct answer)
Correct answer: On belay
'On belay' (or 'Belay on') is the belayer's confirmation that they are actively managing the rope and the system is ready.
What does 'Up rope' direct the belayer to do?