A METRC transport manifest lists 10 packages, but only 9 are loaded on the vehicle. What is the correct course of action before departure?
-
A
Proceed with the transfer and note the discrepancy verbally to the driver
-
B
Edit the manifest in METRC to remove the missing package before departure
-
C
Deliver the 9 packages and create a second transfer for the missing package the next day
-
D
Cancel the entire transfer and restart with a new manifest