MArch Master of Architecture Master of Architecture: Professional Practice 4 — Questions and Answers
Question 1: An architect working in multiple states must hold licensure in each state where they practice because licensure is:
- Federally issued and nationally valid
- Issued by each state independently with its own requirements (Correct answer)
- Transferable automatically via NCARB certification
- Only required for projects over $500,000
Correct answer: Issued by each state independently with its own requirements
Architecture licensure is regulated by individual state licensing boards, and each state has its own requirements; an architect must be licensed in every state where they practice.
Question 2: The 'Spearin Doctrine' in US construction law holds that when an owner provides design documents to a contractor, the owner impliedly warrants that:
- The contractor will complete the project on time
- The documents are accurate and buildable if followed (Correct answer)
- The architect is liable for all field changes
- The contractor assumes all design risk
Correct answer: The documents are accurate and buildable if followed
The Spearin Doctrine (U.S. v. Spearin, 1918) establishes that an owner implicitly warrants the accuracy of owner-furnished plans and specifications, shifting design risk to the owner.
Question 3: Which fee structure best protects an architect when project scope is uncertain or likely to change significantly?
- Lump sum (fixed fee)
- Percentage of construction cost
- Hourly rate (time and expense) (Correct answer)
- Unit cost fee
Correct answer: Hourly rate (time and expense)
An hourly rate fee structure protects the architect when scope is uncertain, ensuring compensation for all actual time spent regardless of project changes.
Question 4: In construction administration, a 'Supplemental Drawing' issued by the architect to clarify original contract documents typically:
- Requires a Change Order to implement
- Does not change scope, cost, or time (Correct answer)
- Must be approved by the building department before use
- Voids the original contract drawing it references
Correct answer: Does not change scope, cost, or time
A supplemental drawing clarifies or provides additional detail to the original contract documents without altering scope, cost, or schedule; it is not a contract modification.
Question 5: Which CSI MasterFormat division typically contains specifications for concrete?
- Division 01
- Division 03 (Correct answer)
- Division 05
- Division 09
Correct answer: Division 03
CSI MasterFormat Division 03 covers Concrete, including cast-in-place concrete, precast concrete, and related materials and methods.
Question 6: An architect who acts as Construction Manager at Risk (CMaR) takes on which additional responsibility compared to traditional design-bid-build?
- Providing a Guaranteed Maximum Price (GMP) for construction (Correct answer)
- Obtaining the building permit on behalf of the owner
- Hiring all subcontractors directly as employees
- Waiving professional liability for design errors
Correct answer: Providing a Guaranteed Maximum Price (GMP) for construction
In CMaR delivery, the construction manager provides a Guaranteed Maximum Price, assuming financial risk for cost overruns above that price.
Question 7: The standard of care in architectural practice is generally defined as the level of skill and care exercised by:
- The best architect in the world under ideal conditions
- A reasonably competent architect in the same geographic area and time period (Correct answer)
- The architect themselves based on their own past performance
- The most experienced architect on any given project type
Correct answer: A reasonably competent architect in the same geographic area and time period
The legal standard of care is measured against what a reasonably competent architect in the same locality and era would do, not perfection.
An architect working in multiple states must hold licensure in each state where they practice because licensure is: