Production Planning and Scheduling Flashcards

6 cards from real Manufacturing and Production practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 6 Production Planning and Scheduling flashcards as text
  1. What is 'capacity planning' in production management?

    Answer: Determining the production capacity needed to meet demand over time

    Capacity planning ensures a manufacturing facility has sufficient production resources to meet current and future demand.

  2. What does 'bottleneck' mean in a production system?

    Answer: The operation with the lowest throughput that limits the entire system's output

    A bottleneck is the constraining resource whose limited capacity determines the maximum output of the entire production system.

  3. Finite capacity scheduling (FCS) differs from infinite capacity scheduling by:

    Answer: Considering actual resource limits when assigning work

    FCS accounts for real constraints like machine hours and labor availability, unlike infinite scheduling which assumes unlimited capacity.

  4. What is a Gantt chart used for in production?

    Answer: Visualizing the schedule of tasks over time on a timeline

    A Gantt chart shows production tasks, their durations, sequences, and timing on a horizontal timeline.

  5. What does 'cycle time' mean in manufacturing?

    Answer: The total time to complete one unit from start to finish at one workstation

    Cycle time is the elapsed time to produce one unit at a given process step, used to balance workloads and calculate output rates.

  6. In production scheduling, 'job shop' scheduling refers to:

    Answer: Managing highly customized orders that follow unique routing through various work centers

    Job shop scheduling handles custom orders where each job may have a different sequence of operations through shared machines.