LMC Assessment & Evaluation Methods 2 โ Questions and Answers
Question 1: Which tool is used to visually separate causes of a problem into major categories during a lean assessment?
- Pareto chart
- Fishbone diagram (Correct answer)
- Control chart
- Value stream map
Correct answer: Fishbone diagram
The fishbone (Ishikawa) diagram organizes root causes into categories like People, Process, Machine, and Environment.
Question 2: A lean team wants to evaluate whether a process change sustained its gains over 90 days. What is the BEST method?
- One-time audit after 90 days
- Control chart tracking key metrics over time (Correct answer)
- Re-running a 5S assessment
- Conducting a single customer survey
Correct answer: Control chart tracking key metrics over time
Control charts reveal whether a process remains in statistical control and sustains improvement gains over time.
Question 3: What does 'takt time' measure in lean evaluation?
- Total cycle time of all process steps
- Rate of customer demand divided by available production time (Correct answer)
- Time wasted in queue between operations
- Maximum throughput capacity of a machine
Correct answer: Rate of customer demand divided by available production time
Takt time = available production time รท customer demand rate, setting the pace the process must match.
Question 4: During a gemba walk, a lean practitioner should primarily focus on:
- Reviewing reports and KPI dashboards at the manager's desk
- Observing actual work conditions and talking to frontline workers (Correct answer)
- Auditing financial statements for waste costs
- Benchmarking competitor processes online
Correct answer: Observing actual work conditions and talking to frontline workers
Gemba walks emphasize going to the actual place of work to observe real conditions and engage workers directly.
Question 5: Which metric best evaluates the efficiency of a lean process by comparing value-added time to total lead time?
- Process cycle efficiency (PCE) (Correct answer)
- Overall equipment effectiveness (OEE)
- First-pass yield (FPY)
- Net promoter score (NPS)
Correct answer: Process cycle efficiency (PCE)
PCE = value-added time รท total lead time, directly measuring how much of the total time actually adds value.
Question 6: When a 5S audit score drops sharply in 'Sustain,' what is the most likely root cause?
- The workspace layout was redesigned
- Daily disciplines and accountability checks are lacking (Correct answer)
- Too many items were sorted out in the first pass
- The standardize phase was skipped
Correct answer: Daily disciplines and accountability checks are lacking
Low Sustain scores indicate insufficient daily routines, visual management, or leadership follow-through to maintain standards.
Question 7: A pull system is best evaluated by measuring:
- Work-in-process (WIP) inventory levels between stations (Correct answer)
- Total number of Kanban cards printed
- Monthly production output volume
- Number of workers cross-trained
Correct answer: Work-in-process (WIP) inventory levels between stations
WIP inventory between stations directly shows whether downstream demand is controlling upstream production as intended by pull.
Which tool is used to visually separate causes of a problem into major categories during a lean assessment?