A landscape lighting transformer is rated at 300 VA. During PM, the measured load is 285 VA. What should the technician recommend?
-
A
The system is fine and no action is needed
-
B
Immediately upgrade to a larger transformer
-
C
Document the high load, advise the client to avoid adding fixtures, and monitor at next PM
-
D
Reduce the number of operating hours to lower the load