A LEED project team holds a mid-design integrative workshop and discovers that daylighting reduces lighting energy loads enough to reduce HVAC cooling loads by 12%. This cascading effect is best described as:
-
A
An acoustical tradeoff requiring acoustical consultant review
-
B
A load interaction synergy identified through integrative process analysis
-
C
A commissioning deficiency noted in the systems manual
-
D
A material substitution documented in the MR credit submittal