A building owner wants to reduce carbon emissions from purchased electricity. Which LEED EA strategy specifically addresses this by procuring electricity from renewable sources off-site?
-
A
Installing a combined heat and power (CHP) system on-site
-
B
Purchasing Renewable Energy Certificates (RECs) through EA Credit: Green Power and Carbon Offsets
-
C
Improving building envelope insulation to reduce heating loads
-
D
Commissioning the HVAC system to run more efficiently