Materials and Resources Cycles Flashcards
7 cards from real LEED practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 7 Materials and Resources Cycles flashcards as text
Which of the following best describes 'design for disassembly' as it relates to LEED Materials and Resources?
Answer: Specifying building systems with mechanical fasteners and modular joints to enable future material recovery
Design for disassembly uses mechanical connections and modular assemblies so building components can be separated and recovered for reuse at end of building life.
A building owner wants to meet LEED's Facility Maintenance and Renovation policy requirement. What must the policy address?
Answer: Sustainable purchasing of ongoing consumables and waste management for future renovation projects
The LEED O+M Facility Maintenance and Renovation policy must cover sustainable purchasing criteria and waste management practices that will apply to future renovation and maintenance activities.
In LEED's Material Ingredients credit, what does a 'Health Product Declaration' (HPD) disclose?
Answer: Hazardous chemical content and health hazard information for a building product
An HPD discloses all chemical ingredients in a product above a defined threshold and flags those with known health hazards based on authoritative hazard lists.
Which of the following material streams, if included in a construction waste management plan, would be classified as 'commingled' recycling?
Answer: All recyclable materials collected in a single container for sorting at a materials recovery facility
Commingled recycling collects multiple recyclable material streams in a single container; sorting happens off-site at a materials recovery facility (MRF).
How does LEED v4 treat furniture and furnishings in the Materials and Resources credits for BD+C projects?
Answer: Furniture is excluded by default but may be included if the project team consistently applies it across all materials credits
LEED v4 allows furniture and furnishings to be included in materials calculations as long as they are included consistently across all materials credits where they are relevant.
A project achieves a 60% construction waste diversion rate by weight but only 40% by volume. Which metric does LEED use to determine compliance?
Answer: The project team may choose to report by weight or volume, and must declare the method in the waste management plan
LEED allows project teams to track and report diversion by either weight or volume, but the chosen method must be declared upfront and applied consistently throughout the project.
Which statement about 'whole-building life-cycle assessment' (LCA) is correct under LEED v4 Building Life-Cycle Impact Reduction?
Answer: It compares the proposed building's structural and enclosure impacts against a baseline building of identical size and function
LEED's whole-building LCA credit requires comparing the proposed design's structural and enclosure life-cycle impacts (e.g., global warming potential) against a code-compliant baseline building of the same program and location.