Lean Six Sigma Yellow Belt Certification The Improve Phase 3 — Questions and Answers
Question 1: A team wants to implement mistake-proofing on an assembly line. What Lean term describes this approach?
- Kanban
- Poka-yoke (Correct answer)
- Heijunka
- Jidoka
Correct answer: Poka-yoke
Poka-yoke refers to mistake-proofing devices or methods that prevent errors or make defects immediately detectable.
Question 2: During solution implementation, which stakeholder communication approach is most effective for reducing resistance?
- Sending email announcements after implementation is complete
- Involving key stakeholders early and updating them throughout the process (Correct answer)
- Having only the project sponsor communicate changes
- Limiting communication until all details are finalized
Correct answer: Involving key stakeholders early and updating them throughout the process
Engaging stakeholders early and maintaining ongoing communication builds trust and reduces resistance to change.
Question 3: A Yellow Belt team proposes increasing inventory buffers to prevent stockouts. A lean practitioner would likely challenge this because:
- Inventory is always the most expensive waste
- Excess inventory is considered a waste that hides other process problems (Correct answer)
- Inventory calculations require Black Belt expertise
- Buffer stock violates ISO standards
Correct answer: Excess inventory is considered a waste that hides other process problems
Lean views excess inventory as waste (muda) because it consumes space and capital while masking underlying process instability.
Question 4: What does a 'future state' value stream map represent in the Improve phase?
- How the process currently operates with all its waste
- The ideal process design after waste is eliminated (Correct answer)
- A control chart of future production volumes
- The project timeline for implementation
Correct answer: The ideal process design after waste is eliminated
The future state map depicts the redesigned process with waste removed, serving as the implementation target.
Question 5: A team runs an A/B test comparing two process configurations. After the test, the new configuration shows a statistically significant improvement. What should be the next step?
- Archive the results and close the project
- Develop an implementation plan to roll out the improved configuration (Correct answer)
- Return to the Analyze phase for further root cause analysis
- Present findings to the MBB for approval
Correct answer: Develop an implementation plan to roll out the improved configuration
Once a solution is validated with statistical significance, the team should plan and execute full-scale implementation.
Question 6: Which of the following best describes a 'pull system' in Lean production?
- Production is scheduled based on forecasted demand
- Downstream processes signal upstream processes to produce only what is needed (Correct answer)
- Managers push work orders to all stations simultaneously
- Products are pulled from finished goods inventory as orders arrive
Correct answer: Downstream processes signal upstream processes to produce only what is needed
A pull system uses downstream demand signals (like kanban cards) to trigger upstream production, reducing overproduction.
Question 7: When implementing a solution, what is the primary reason for documenting the new standard operating procedure (SOP)?
- To satisfy auditors during ISO certification reviews
- To ensure the improvement is consistently applied and gains are sustained (Correct answer)
- To justify the cost of the Six Sigma project to management
- To train replacement workers only when turnover occurs
Correct answer: To ensure the improvement is consistently applied and gains are sustained
SOPs capture the improved method so every operator performs the process the same way, sustaining the gains over time.
A team wants to implement mistake-proofing on an assembly line.
What Lean term describes this approach?