Lean Six Sigma Yellow Belt Certification Measure Phase Tools 5 — Questions and Answers
Question 1: A data collection check sheet is most valuable because it:
- Automatically analyzes variation and calculates sigma level
- Provides a structured, consistent format for recording data at the source (Correct answer)
- Replaces the need for a measurement system analysis
- Identifies the critical-to-quality characteristics automatically
Correct answer: Provides a structured, consistent format for recording data at the source
Check sheets standardize how data is recorded in real time at the point of occurrence, reducing transcription errors and ensuring completeness.
Question 2: Which measure of dispersion is most sensitive to extreme values (outliers) in a dataset?
- Interquartile range (IQR)
- Range (Correct answer)
- Standard deviation
- Median absolute deviation
Correct answer: Range
The range uses only the maximum and minimum values, so a single extreme outlier can dramatically inflate it.
Question 3: When using an X-bar and R control chart, a 'run of eight' consecutive points on one side of the centerline indicates:
- Normal random variation within control limits
- A potential process shift or special cause requiring investigation (Correct answer)
- The process is perfectly centered and stable
- The measurement system is biased
Correct answer: A potential process shift or special cause requiring investigation
Eight or more consecutive points on one side of the centerline is a non-random pattern signaling a likely process shift, even if all points are within control limits.
Question 4: The 'voice of the process' (VOP) is best captured using:
- Customer surveys and focus groups
- Statistical process control charts and process capability data (Correct answer)
- SIPOC diagrams and stakeholder interviews
- Pareto charts of customer complaints
Correct answer: Statistical process control charts and process capability data
SPC charts and capability indices reflect how the process actually performs statistically, representing the voice of the process.
Question 5: Process cycle efficiency (PCE) is calculated as:
- Defects per million opportunities divided by total opportunities
- Value-added time divided by total lead time, expressed as a percentage (Correct answer)
- Total throughput divided by available production hours
- Number of defect-free units divided by total units inspected
Correct answer: Value-added time divided by total lead time, expressed as a percentage
PCE measures the proportion of lead time that adds value; a low PCE indicates significant waste in the form of waiting, rework, or transport.
Question 6: In Lean Six Sigma, 'DPMO' stands for:
- Defects Per Machine Operation
- Defects Per Million Opportunities (Correct answer)
- Daily Process Measurement Output
- Defect Probability Margin of Operations
Correct answer: Defects Per Million Opportunities
DPMO normalizes defect rates to a per-million-opportunities scale, enabling fair comparison across processes with different complexity levels.
Question 7: Which Measure phase activity directly feeds into calculating the baseline sigma level of a process?
- Drawing the process map and SIPOC diagram
- Collecting defect data and counting total defect opportunities (Correct answer)
- Conducting a Gage R&R study to validate the measurement system
- Interviewing customers to identify critical-to-quality requirements
Correct answer: Collecting defect data and counting total defect opportunities
Baseline sigma level is calculated from actual defect counts and the total number of defect opportunities, requiring real process performance data.