← All Lean Six Sigma Yellow Belt Certification Flashcard Decks

The Measure Phase Flashcards

7 cards from real Lean Six Sigma Yellow Belt Certification practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 The Measure Phase flashcards as text
  1. Which data collection technique involves observing the actual process in real time rather than relying on historical records?

    Answer: Direct observation (gemba)

    Direct observation (going to the gemba, or actual workplace) captures what truly happens rather than what historical records or memory suggest.

  2. A check sheet is most useful in the Measure phase for:

    Answer: Systematically collecting and tallying defect or event data in real time

    A check sheet is a structured form for collecting and organizing data at the source, making tallying and pattern recognition easy.

  3. In a SIPOC diagram, what does the 'O' represent?

    Answer: Outputs

    In SIPOC (Suppliers, Inputs, Process, Outputs, Customers), 'O' stands for Outputs — the products, services, or information produced by the process.

  4. Which control chart is appropriate for monitoring the average and variation of a continuous measurement when subgroup size is 5?

    Answer: X-bar and R chart

    The X-bar and R chart monitors subgroup means (X-bar) and subgroup ranges (R) for continuous data with subgroup sizes typically between 2 and 10.

  5. What is the purpose of calculating 'rolled throughput yield' (RTY) in the Measure phase?

    Answer: To measure the probability that a unit passes through all process steps without any defects

    RTY is the product of first-pass yields at each process step, revealing the true probability a unit is completed defect-free without rework.

  6. When a team notices that measurements drift upward over the course of a shift, this is an example of measurement system:

    Answer: Stability (drift) error

    Stability (or drift) refers to changes in a measurement system's bias over time, often caused by tool wear, temperature changes, or calibration drift.

  7. Which of the following is NOT a common source of variation that a cause-and-effect (fishbone) diagram would explore in the Measure phase?

    Answer: Market (competition)

    The standard 6M categories of a fishbone diagram are Man, Machine, Method, Material, Measurement, and Mother Nature (environment) — not Market.