  1. A team uses a Pugh Concept Selection Matrix to evaluate solutions. What is the primary purpose of this tool?

    Answer: To compare multiple solution alternatives against weighted criteria

    The Pugh matrix scores competing solutions against evaluation criteria, helping teams select the best option objectively.

  2. During a kaizen event, the team identifies a process step that adds no value. According to Lean principles, what should they do first?

    Answer: Eliminate the step if possible

    Lean's first priority is to eliminate non-value-added steps entirely before considering optimization or automation.

  3. A solution pilot is run on one production line before full rollout. What does the pilot primarily validate?

    Answer: That the solution is feasible and achieves the desired improvement

    A pilot tests solution feasibility and effectiveness at small scale before committing to full implementation.

  4. Which improvement tool is best suited for reducing changeover time between product runs?

    Answer: SMED (Single-Minute Exchange of Die)

    SMED is a Lean technique specifically designed to reduce equipment changeover and setup times.

  5. A process improvement reduces average cycle time from 12 minutes to 8 minutes. What is the percentage improvement?

    Answer: 33%

    The reduction is 4 minutes from a baseline of 12 minutes: (4/12) × 100 = 33.3% improvement.

  6. In the Improve phase, what is the purpose of a risk assessment before implementing a solution?

    Answer: To anticipate potential failure modes and plan mitigation actions

    Risk assessment (often via FMEA) identifies what could go wrong with the solution so mitigation plans can be prepared in advance.

  7. A team implements 5S in a work area. Which step involves keeping the work area clean and identifying problems through cleanliness?

    Answer: Shine