← All Lean Six Sigma Yellow Belt Certification Flashcard Decks

Lean Concepts and Waste Flashcards

7 cards from real Lean Six Sigma Yellow Belt Certification practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Lean Concepts and Waste flashcards as text
  1. Which Lean concept focuses on making problems and waste immediately visible so they can be addressed quickly?

    Answer: Visual management

    Visual management uses visual signals, indicators, and displays to make the status of processes and problems immediately apparent to everyone.

  2. A call center measures average handle time but never measures the rate of repeat calls for the same issue. Which waste is likely being overlooked?

    Answer: Defects

    Repeat calls indicate a defect — the first interaction failed to resolve the customer's issue, requiring rework in the form of another call.

  3. What is the purpose of 'leveling production' (Heijunka) in Lean manufacturing?

    Answer: To smooth out production volume and mix to reduce unevenness and overburden

    Heijunka levels production by distributing work evenly over time, reducing the Mura (unevenness) that causes Muri (overburden) and Muda (waste).

  4. A physician always orders a full panel of 20 lab tests for every patient, even when only 3 tests are clinically indicated. This is which type of waste?

    Answer: Extra processing / overproduction

    Ordering unnecessary tests is overproduction and over-processing — providing more service than the customer (patient) needs or benefits from.

  5. In Lean, 'continuous flow' means:

    Answer: Processing one unit at a time and passing it immediately to the next step

    Continuous flow (one-piece flow) moves individual units through the process without batching, dramatically reducing lead time and inventory waste.

  6. Which of the following scenarios best illustrates 'overproduction' waste in a service environment?

    Answer: A team preparing 50 copies of a report when only 10 attendees will be at the meeting

    Printing 50 copies when only 10 are needed is overproduction — producing more than is required wastes materials and effort.

  7. What is the relationship between waste elimination and customer value in Lean thinking?

    Answer: Eliminating waste reduces cost and lead time, which improves the value delivered to customers

    By eliminating waste, organizations reduce costs and lead times, enabling them to deliver more value to customers at a lower price and faster speed.