  1. What does 'Muri' mean in the context of the three types of waste in Lean?

    Answer: Overburden on people or machines

    Muri refers to overburden — pushing workers or equipment beyond their natural capacity, leading to breakdowns and errors.

  2. Which waste category does rework of defective products fall into?

    Answer: Both defects and extra processing

    Rework represents defects (the item failed) and extra processing (additional work to correct the failure), capturing both waste types.

  3. A Lean practitioner performs a 'Gemba walk.' What is the primary purpose of this activity?

    Answer: To go to the actual workplace and observe real processes to identify waste

    A Gemba walk involves going to where work is done to observe processes firsthand and identify waste, problems, and improvement opportunities.

  4. Takt time is calculated as which of the following?

    Answer: Available production time divided by customer demand rate

    Takt time = available production time / customer demand, setting the pace at which products must be completed to meet demand.

  5. Which of the following best describes a 'value-added' activity in Lean?

    Answer: An activity that transforms the product in a way the customer values and is willing to pay for

    A value-added activity physically transforms the product or service in a way the customer recognizes and would pay for.

  6. An inspection step at the end of a production line that catches defects is considered which type of activity?

    Answer: Business-value-added (necessary non-value-added)

    Inspection is a necessary non-value-added activity — it doesn't transform the product but may be required to ensure quality until root causes are eliminated.

  7. In a Lean office environment, which of the following would be classified as a 'defect' waste?

    Answer: An invoice sent with incorrect billing information requiring correction

    An incorrect invoice is a defect in a service process — it requires rework, delays payment, and damages customer trust.