← All Lean Six Sigma Black Belt Certification Flashcard Decks

Statistical Process Control (SPC) Flashcards

7 cards from real Lean Six Sigma Black Belt Certification practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Statistical Process Control (SPC) flashcards as text
  1. When calculating the process performance index Ppk, which measure of sigma is used?

    Answer: Overall sample standard deviation of all individual values

    Ppk uses the overall (long-term) standard deviation calculated from all individual data points, capturing both common and special cause variation.

  2. A Black Belt wants to detect a 1.5-sigma shift in the process mean quickly. Which chart would be MOST effective?

    Answer: CUSUM or EWMA chart

    CUSUM and EWMA charts are specifically designed to detect small to moderate process mean shifts (1–2 sigma) much faster than Shewhart charts.

  3. Which assumption is critical for control charts based on the normal distribution to be valid?

    Answer: Observations must be independent and identically distributed

    Control charts assume observations are independent and come from the same distribution; autocorrelation or non-stationarity can cause false signals and misleading limits.

  4. On an I-MR chart, the Moving Range chart monitors which source of variation?

    Answer: Consecutive point-to-point variation (short-term variability)

    The MR chart tracks the absolute difference between consecutive individual values, capturing short-term, point-to-point process variability.

  5. A process engineer discovers that subgroups on an X-bar chart were formed by collecting samples from multiple process streams mixed together. What problem does this cause?

    Answer: Control limits that are too narrow, causing false alarms

    Mixing samples from multiple streams within a subgroup inflates within-subgroup variation, narrowing control limits and producing excessive false alarms (a violation of rational subgrouping).

  6. The Average Run Length (ARL) of a control chart at the in-control state is approximately 370 for 3-sigma limits. What does this mean?

    Answer: On average, a false alarm occurs once every 370 subgroups when the process is in control

    ARL₀ ≈ 370 for 3-sigma Shewhart charts means a false alarm (Type I error) is expected approximately once every 370 subgroups when no real shift has occurred.

  7. Which control chart would be used to monitor the fraction of nonconforming units when subgroup sizes are unequal?

    Answer: p-chart

    The p-chart monitors the proportion (fraction) of nonconforming items and accommodates variable subgroup sizes, with control limits recalculated for each subgroup size.