  1. A team performs an attribute agreement analysis and finds that appraisers agree with each other 72% of the time but agree with the standard only 60% of the time. What should the team do first?

    Answer: Investigate and standardize the appraisal criteria and training

    Low agreement with the standard indicates poor accuracy; the team should clarify criteria, retrain appraisers, and rerun the study before collecting process data.

  2. Which metric captures the percentage of time a process produces output without any defects, rework, or scrap on the first attempt?

    Answer: First Pass Yield (FPY)

    First Pass Yield (FPY) measures the proportion of units that complete the process correctly the first time without any rework.

  3. A project team calculates Rolled Throughput Yield (RTY) for a 4-step process with individual step yields of 95%, 92%, 98%, and 90%. What is the approximate RTY?

    Answer: 77.0%

    RTY is the product of all step yields: 0.95 × 0.92 × 0.98 × 0.90 ≈ 0.770, showing how hidden rework dramatically reduces true throughput yield.

  4. In a SIPOC diagram, which column directly feeds into the process steps column?

    Answer: Inputs

    Inputs (materials, information, resources) are what enter each process step and are supplied by the Suppliers column to the left.

  5. A Black Belt selects a sample size for a baseline capability study. The primary driver of minimum sample size is ensuring which of the following?

    Answer: Sufficient statistical power to detect meaningful shifts

    Sample size must be large enough to provide adequate statistical power to detect the difference or capability level of practical importance.

  6. A value stream map is created in the Measure phase. Which metric represents the ratio of value-added time to total lead time?

    Answer: Process cycle efficiency (PCE)

    Process Cycle Efficiency (PCE) = Value-Added Time ÷ Total Lead Time, and is used to quantify the proportion of time the process spends adding value.

  7. During the Measure phase, a team uses a check sheet to collect data. What is the primary purpose of a check sheet?

    Answer: Systematically collect and tally defect or event data

    Check sheets provide a structured, easy-to-use form for recording and tallying data as events occur, ensuring consistent data collection.