An isometric drawing of a multi-story building shows a soil stack with horizontal branches at each floor. Which fitting at the base of the stack is critical and must be shown on the drawing?
-
A
A reducing coupling
-
B
A long-sweep 90° or combination wye and 1/8 bend at the stack base
-
C
A sanitary tee
-
D
A P-trap