← All Journeyman Plumbers Exam Flashcard Decks

Venting and Backflow Prevention Flashcards

7 cards from real Journeyman Plumbers Exam practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Venting and Backflow Prevention flashcards as text
  1. When a common vent connects two fixture drains at the same level, each drain must enter the vertical stack at:

    Answer: The same fitting with a double-wye

    A common vent requires a double-wye or similar approved fitting that allows both fixture drains to enter at the same elevation.

  2. What is the minimum slope for a horizontal wet vent pipe?

    Answer: 1/4 inch per foot

    Horizontal wet vent pipes must slope at least 1/4 inch per foot toward the drain to maintain proper flow and self-scouring velocity.

  3. An atmospheric vacuum breaker installed on an irrigation system must be located at least how far above the highest downstream outlet?

    Answer: 6 inches

    Atmospheric vacuum breakers must be installed at least 6 inches above the highest downstream outlet to prevent submersion and backflow.

  4. Which situation requires a backflow preventer on a potable water supply to a boiler?

    Answer: When chemical treatment is added to the boiler water

    Chemical additives in boiler water create a high-hazard cross-connection, requiring at minimum an RPZ assembly to protect the potable supply.

  5. A relief vent is used to:

    Answer: Restore air circulation in a system where excessive positive pressure occurs

    A relief vent is installed to restore air circulation and relieve positive or negative pressure at a critical point in the drainage system.

  6. What is the minimum size vent stack required for a building drain carrying 100 drainage fixture units (DFU)?

    Answer: 4 inches

    Per IPC venting tables, a vent stack serving a building drain with 100 DFUs requires a minimum 4-inch vent stack.

  7. Where must a relief vent connect to the vent stack when installed at a branch interval?

    Answer: Between the branch drain and the next higher branch

    A relief vent at a branch interval must connect to the vent stack at a point between the branch drain it serves and the next higher branch drain connection.