IPC Cheat Sheet 2026
The 30 highest-yield IPC facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.
60 questions
120 min time limit
75% to pass
- Which of the following trap designs is expressly prohibited by the International Plumbing Code because it relies on moving parts to maintain its seal? → A trap with a float ball mechanism
- When connecting a dry vent pipe to a horizontal sanitary drainage pipe, which of the following describes the required connection point? → At or above the centerline of the horizontal drain
- According to the IPC, what happens to the trap seal when a nearby fixture discharges a large volume of water rapidly? → Induced siphonage can pull the trap seal out
- Under the IPC, what protection is required where drainage piping passes under a building foundation? → A sleeve or casing two pipe sizes larger must be used
- Under the IPC, when is an oil separator required on a drainage system? → When flammable liquids or oils may be discharged into the system
- Which of the following is an unacceptable location for a potable water service pipe according to the IPC? → Located in, under, or above a septic tank drainage field.
- Gray water that enters a collection reservoir must be ________. → Filtered
- A plumber is installing fixtures in a new commercial building. Which of the following is a requirement for water closets provided for public use? → They must be equipped with seats of the hinged open-front type.
- Per the IPC, what is required at the joint between a roof drain body and a structural concrete deck? → A clamping ring that secures waterproofing membrane to the drain body
- According to the IPC, 'clear-water waste' drainage systems handle discharge from sources such as: → Non-contaminated sources such as air conditioning condensate and swimming pool backwash
- What does the IPC specify regarding the use of used or reclaimed plumbing materials? → They may be used if approved by the code official
- A plumber is installing a new building sewer. According to the IPC, a cleanout is required at intervals of not more than: → 100 feet
- Under the IPC, when is a laundry interceptor required? → In commercial laundry facilities that may discharge lint, string, or rags
- Flux can only be used in the brazing process when: → Brazing copper to brass
- Under the IPC, what type of trap is specifically prohibited for use in drainage systems? → S-trap
- When flow controls are installed on gas piping, they __________. → Are used to keep operating pressure lower than the supply pressure
- What is the maximum amount of time that gray water is allowed to be retained for use to flush a toilet or urinal? → 72 hours
- Flexible water connections are required to be _________. → accessible
- Per the IPC, what is the maximum spacing allowed between cleanouts on a building storm drain? → 100 feet
- According to the IPC, what is the minimum distance a vent opening must be from any operable window or air intake? → 10 feet
- All pipes used in plumbing applications will have all of the following markings except: → Length of pipe
- Which of the following is NOT typically a power or duty of the code official as defined in Chapter 1 of the IPC? → To establish the fee schedule for permits and inspections.
- Per the IPC, the design rainfall intensity used for sizing storm drainage systems must be based on: → Rainfall data specific to the geographical location of the project
- Water heaters, hose bibs and sill cocks are normally protected from backflow with ________. → A vacuum breaker
- What does the IPC require regarding the grade of underground horizontal drainage piping? → A uniform grade throughout the entire run
- Under the IPC, what is the minimum frequency for cleaning a hydromechanical grease interceptor? → When it reaches 25% grease capacity
- Under the IPC, what type of valve is required on the water supply to each individual plumbing fixture? → An accessible shutoff valve
- According to the IPC, what is required for plumbing installations in seismic design categories D, E, and F? → Piping must be braced and supported for seismic forces
- What does the IPC require regarding the testing of backflow prevention assemblies after installation? → They must be tested immediately after installation and annually thereafter
- In a commercial building, the static water pressure from the city main is found to be 95 psi. What action is required by the IPC? → Install a pressure-reducing valve to reduce the pressure to 80 psi or less.
Turn these facts into recall: