When a firestop contractor discovers that a previously installed penetration seal has been disturbed by another trade, what is the FIRST action that should be taken?
-
A
Immediately repair the seal without documentation
-
B
Document the disturbance and notify the general contractor
-
C
Ignore it if the disturbance appears minor
-
D
Cover the area to prevent inspection