Home Inspector Test Practice Test
Home Inspector Test Home Inspector Foundation and Basement Inspection 3
What is a 'cold joint' in a poured concrete foundation wall?
Select your answer
A
A crack caused by freezing temperatures during curing
B
A visible seam where two separate concrete pours meet, often a path for water infiltration
C
A control joint intentionally cut into the slab
D
The joint between the footing and the foundation wall
Hint