Materials and Methods of Construction Flashcards

7 cards from real General Contractor License practice questions. Tap to flip, then mark Knew It or Still Learning β€” missed cards come back until you master them.

Read the first 7 Materials and Methods of Construction flashcards as text
  1. What does a concrete slump test measure?

    Answer: Workability and consistency of fresh concrete

    The slump test measures the workability (consistency and fluidity) of fresh concrete by recording how much a standard cone of concrete settles after the mold is removed.

  2. Which plywood grade designation indicates that both faces are sanded and free of open defects?

    Answer: A-A

    A-A plywood has both faces graded 'A,' meaning they are smooth, paintable, and free of open defects, making it suitable for fine finish applications.

  3. What is the purpose of expansion joints in concrete flatwork?

    Answer: To allow independent movement between sections and prevent cracking

    Expansion joints separate concrete sections so each can expand, contract, and settle independently, preventing uncontrolled cracking from thermal and moisture movement.

  4. Which drywall type is required by code in areas exposed to high moisture, such as bathrooms and kitchens?

    Answer: Moisture-resistant (green board) or cement backer board

    Moisture-resistant gypsum board or cement backer board is required in wet areas because standard drywall deteriorates rapidly when repeatedly exposed to moisture.

  5. What is the correct water-to-cement ratio (w/c) guideline for producing durable, high-strength concrete?

    Answer: Lower w/c ratios produce stronger, more durable concrete

    A lower water-to-cement ratio reduces porosity and increases compressive strength and durability; excess water creates voids as it evaporates, weakening the matrix.

  6. Which fire-resistance rating is typically required for a floor-ceiling assembly separating dwelling units in a two-family residential building?

    Answer: 1 hour

    IBC and IRC typically require a minimum 1-hour fire-resistance rating for floor-ceiling assemblies separating dwelling units to allow safe egress time in the event of fire.

  7. What is the function of flashing in a building assembly?

    Answer: To direct water away from vulnerable joints and penetrations

    Flashing is sheet metal or membrane material installed at joints, transitions, and penetrations to redirect water away from the building envelope and prevent infiltration.

Materials and Methods of Construction Flashcards β€” General Contractor License Study Cards with Answers