Free F60 Permits and Record Keeping Questions and Answers 1 — Questions and Answers
Question 1: A contractor holds a valid FDNY citywide permit for torch operations and plans to work at a new location for five days. Before work can begin at this specific site, what additional documentation is required?
- A new citywide permit for the specific address.
- A Hot Work Program Authorization issued by the building owner's designated Responsible Person. (Correct answer)
- A verbal approval from the local firehouse.
- A temporary permit from the Department of Buildings.
Correct answer: A Hot Work Program Authorization issued by the building owner's designated Responsible Person.
A citywide permit allows a company to perform hot work at various locations. However, for each specific site, the building owner must designate a 'Responsible Person' who inspects the area and issues a Hot Work Program Authorization before that specific job can commence. This ensures site-specific hazards are evaluated.
Question 2: According to FDNY regulations, for how long must the Hot Work Program Authorization, signed by the Responsible Person, be kept available for inspection after the completion of hot work?
- 24 hours
- 7 days
- 48 hours (Correct answer)
- 30 days
Correct answer: 48 hours
The FDNY Fire Code stipulates that the Hot Work Program Authorization must be available for inspection by any representative of the Fire Department during the work and for a period of 48 hours after the work is complete.
Question 3: Which of the following best describes the key difference between a site-specific hot work permit and a citywide hot work permit issued by the FDNY?
- A site-specific permit is for indoor work only, while a citywide permit is for outdoor work.
- A site-specific permit is issued for a single, fixed location, while a citywide permit allows for work at multiple temporary locations. (Correct answer)
- A site-specific permit is valid for 30 days, while a citywide permit is valid for one year.
- A site-specific permit does not require a fire guard, while a citywide permit always does.
Correct answer: A site-specific permit is issued for a single, fixed location, while a citywide permit allows for work at multiple temporary locations.
A site-specific permit authorizes hot work at a single premises, such as a permanent repair garage. A citywide permit authorizes the holder to conduct operations at various temporary locations throughout the city, with certain restrictions on the duration at any single location.
Question 4: An F-60 Fire Guard arrives at a job site and is shown the Hot Work Program Authorization. They notice that the date on the authorization is from two days prior and the work is scheduled to start today. What is the correct action for the Fire Guard to take?
- Proceed with the fire watch since an authorization was issued.
- Cross out the old date and write in the current date.
- Inform the torch operator that work cannot begin until the Responsible Person conducts a new pre-work check and issues a current authorization. (Correct answer)
- Call the FDNY to report the expired authorization.
Correct answer: Inform the torch operator that work cannot begin until the Responsible Person conducts a new pre-work check and issues a current authorization.
A pre-hot work check must be conducted by the Responsible Person before work is authorized and at least once per day while the authorization is in effect. An authorization from a previous day is not valid for the current day's work without a new inspection to ensure conditions have not changed.
Question 5: The 'Responsible Person' designated by the building owner plays a critical role in the hot work process. Which of the following is a primary record-keeping duty of the Responsible Person?
- Issuing the F-60 Certificate of Fitness to the Fire Guard.
- Maintaining a log of all fire extinguishers used on the premises.
- Inspecting the hot work area and signing the Hot Work Program Authorization before work begins. (Correct answer)
- Filing the citywide permit application with the FDNY on behalf of the contractor.
Correct answer: Inspecting the hot work area and signing the Hot Work Program Authorization before work begins.
The Responsible Person's key duty is to inspect the specific work area to ensure it is fire-safe and then to issue and sign the Hot Work Program Authorization. This document is the official record authorizing the specific hot work operation at that time and place.
Question 6: A permanent permit for site-specific hot work operations, such as in a metal fabrication shop, is typically valid for what duration before renewal and re-inspection are required?
- 30 days
- 90 days
- 6 months
- 12 months (Correct answer)
Correct answer: 12 months
Permanent, site-specific permits issued by the FDNY for ongoing hot work operations at a fixed location are valid for 12 months. They require an inspection for issuance and renewal.
A contractor holds a valid FDNY citywide permit for torch operations and plans to work at a new location for five days.
Before work can begin at this specific site, what additional documentation is required?