  1. Who is responsible for performing the pre-operation inspection of a forklift?

    Answer: The trained operator assigned to the truck

    The trained, authorized operator is responsible for inspecting the truck before each use.

  2. What is the purpose of checking the hydraulic fluid level before operation?

    Answer: To ensure the truck can lift loads properly

    Adequate hydraulic fluid is needed for the lift and tilt systems to function safely.

  3. During inspection, the tilt mechanism should be checked to ensure it:

    Answer: Moves the mast forward and back smoothly and holds position

    The tilt function should operate smoothly in both directions and hold the mast position without drifting.

  4. If lights are required for the work environment but are not functioning, the operator should:

    Answer: Remove the truck from service until repaired

    Required lighting is a safety feature; a truck with non-working lights should be taken out of service where lights are needed.

  5. What is a sign that a forklift's hydraulic cylinders may be leaking?

    Answer: Oil film or drips on the cylinder rods and mast

    Oil film or drips on cylinder rods indicate seal leakage that can lead to lift failure.

  6. Why should the operator test the forklift's controls before carrying any load?

    Answer: To confirm all functions work correctly and safely

    Testing controls before loading ensures the truck responds correctly and prevents accidents under load.

  7. What should be done with the inspection checklist after completing the pre-operation inspection?

    Answer: Sign, date, and file or submit it as required

    The completed checklist should be signed, dated, and retained per the employer's recordkeeping requirements.