A project manager needs to calculate safety stock. Daily demand is normally distributed with a mean of 100 units and a standard deviation of 15 units. Lead time is 4 days and the desired service level requires a Z-score of 1.65. What is the safety stock?
-
A
24.75 units
-
B
49.5 units
-
C
99 units
-
D
24 units