FEMA certifications FEMA Public Assistance Program 2 — Questions and Answers
Question 1: Under FEMA's PA Program, what does 'Permanent Work' (Categories C–G) cover?
- Emergency shelter and feeding operations
- Restoration of disaster-damaged infrastructure to pre-disaster condition (Correct answer)
- Debris removal operations
- Temporary housing for displaced residents
Correct answer: Restoration of disaster-damaged infrastructure to pre-disaster condition
Permanent Work categories (C–G) cover the repair, restoration, or replacement of disaster-damaged facilities to their pre-disaster design, function, and capacity.
Question 2: What is the '50 Percent Rule' in FEMA's Public Assistance Program?
- FEMA pays 50% of all PA projects regardless of category
- If repair costs exceed 50% of replacement cost, replacement may be funded instead of repair (Correct answer)
- Federal cost share increases to 100% for projects over $500,000
- Applicants must fund 50% of emergency protective measures upfront
Correct answer: If repair costs exceed 50% of replacement cost, replacement may be funded instead of repair
The 50 Percent Rule states that if the cost to repair a facility exceeds 50% of the cost to replace it to current codes, FEMA may fund replacement rather than repair.
Question 3: What is the purpose of the FEMA Public Assistance 'Grants Portal'?
- To allow citizens to apply for individual assistance
- To manage the PA application and grant management process electronically (Correct answer)
- To provide real-time disaster alerts
- To track NFIP flood insurance claims
Correct answer: To manage the PA application and grant management process electronically
The FEMA Grants Portal is the online system applicants use to submit, manage, and track their Public Assistance grant applications and project documentation.
Question 4: Under FEMA PA, what is a 'Project Worksheet' (PW)?
- A form applicants complete to request individual assistance
- The primary document that identifies eligible work and costs for a PA project (Correct answer)
- A budget document for FEMA regional offices
- An inspection checklist used by FEMA inspectors
Correct answer: The primary document that identifies eligible work and costs for a PA project
A Project Worksheet is the primary document used to describe the eligible scope of work and costs for each Public Assistance project.
Question 5: Which PA program element allows FEMA to fund mitigation measures added to permanent work projects?
- Hazard Mitigation Grant Program
- 406 Hazard Mitigation (Correct answer)
- Community Rating System
- BRIC Program
Correct answer: 406 Hazard Mitigation
Section 406 Hazard Mitigation allows applicants to include cost-effective mitigation measures in permanent PA projects to reduce the risk of future damage.
Question 6: What is the 'improved project' option in FEMA's Public Assistance Program?
- A project that receives a higher federal cost share
- Restoring a facility to a better condition than before the disaster while FEMA funds only pre-disaster restoration costs (Correct answer)
- A project approved without an environmental review
- A project with expedited obligation timelines
Correct answer: Restoring a facility to a better condition than before the disaster while FEMA funds only pre-disaster restoration costs
An improved project allows an applicant to upgrade a facility beyond pre-disaster standards, with FEMA funding only the eligible pre-disaster restoration costs and the applicant funding the difference.
Under FEMA's PA Program, what does 'Permanent Work' (Categories C–G) cover?