A CSP implements a compensating control because the baseline control is technically infeasible. What documentation is required?
-
A
Only verbal approval from the 3PAO lead assessor
-
B
A formal deviation request or alternative implementation documented in the SSP with justification
-
C
A waiver signed by the FedRAMP PMO Director
-
D
No documentation is needed if the compensating control is NIST-approved