A facility's compressed air system is found to have a leak rate of 30% of total output. Which remediation step should be prioritized first?
-
A
Upgrade the compressor to a higher-capacity unit
-
B
Conduct an ultrasonic leak detection survey and tag all leaks for repair
-
C
Increase system pressure to compensate for lost air
-
D
Install a larger air receiver tank