A facility's compressed air system is found to have a leak rate of 30% of total output. Which remediation step should be prioritized first?
Answer: Conduct an ultrasonic leak detection survey and tag all leaks for repair
Ultrasonic leak detection identifies and tags leaks so they can be systematically repaired, directly addressing the root cause of energy waste.
Which mitigation strategy best addresses excessive reheat energy consumption in a dual-duct HVAC system?
Answer: Convert to a single-duct variable air volume (VAV) system
Converting to a VAV system eliminates simultaneous heating and cooling, which is the primary source of reheat energy waste in dual-duct systems.
A manufacturing plant wants to recover waste heat from a 400°F exhaust stream. Which technology is most appropriate for this temperature range?
Answer: Recuperator or regenerator heat exchanger
Recuperators and regenerators are designed to capture high-temperature exhaust heat and transfer it to combustion air or process streams efficiently.
Which measure most effectively mitigates vampire load (standby power) losses in a commercial office building?
Answer: Deploying smart power strips and scheduling equipment shutdown policies
Smart power strips cut power to devices in standby mode, and shutdown policies ensure equipment is fully de-energized outside occupied hours.
A chiller plant operates with a COP of 3.2 against a benchmark of 5.0. Which corrective action addresses condenser-side degradation?
Answer: Clean condenser tubes and verify cooling tower performance
Fouled condenser tubes and poor cooling tower performance raise condensing pressure, directly reducing COP; cleaning and verifying tower performance restores efficiency.
An energy manager finds that a facility's power factor is 0.72 lagging. Which mitigation measure directly corrects this?
Answer: Adding power factor correction capacitors at the main service entrance or motor terminals
Capacitors supply reactive power locally, raising power factor toward unity and reducing utility demand charges for reactive power.
Which building envelope remediation measure provides the greatest energy impact in a heating-dominated climate for a poorly insulated existing building?
Answer: Adding continuous exterior insulation to opaque walls