What is the maximum open time for EIFS finish coat application before tooling to achieve a consistent texture?
-
A
It varies by product but typically must be tooled while still wet and workable per manufacturer instructions
-
B
Finish coat can be tooled up to 24 hours after application
-
C
Finish coat must be tooled within 5 minutes of application regardless of conditions
-
D
Open time is unlimited as long as the surface is kept damp