In PLC programming, what is 'dead-band' as it applies to analog process control?
-
A
The time delay between a setpoint change and controller response
-
B
A range around a setpoint within which no corrective action is taken
-
C
The maximum allowable deviation before a safety shutdown
-
D
The signal loss across long analog wiring runs