Which of the following best describes a 'warm site' in disaster recovery planning?
-
A
A site with no equipment that must be fully built out after a disaster
-
B
A fully operational duplicate of the primary site
-
C
A partially equipped site that requires some setup time before use
-
D
A mobile trailer with portable computing equipment